Planning to upgrade Nintex Workflow 2010 from 2.3.3.0 to 2.3.10.0
1. Is it required to terminate or complete running instances of the workflows? or would they continue to run without a problem after upgrade?
2. Following are some of the issues I have seen with Nintex 2.3.3.0 .Does 2.3.10.0 addresses them?
2.1 Memory leak (An SPRequest object was reclaimed by the garbage collector instead of being explicitly freed, Unknow SPRequest error occured.)
2.2 This task is currently locked by a running workflow and cannot be edited.
Unexpected: Nintex.Workflow.NWHumanApprovalException: Failed to update workflow task. ---> Microsoft.SharePoint.SPException: This task is currently locked by a running workflow and cannot be edited.